0
World

Nankabirwa flags off 400 MW Kiba power dam technical studies as industrial demand hits record high

May 9, 2026
Scroll

Posted 3 hours ago by

KAMPALA — Energy and Mineral Development Minister, Ruth Nankabirwa Ssentamu has flagged off the feasibility study and environmental assessment for the 400 MW Kiba Hydropower Project, warning that the country must fast-track new generation to avoid a looming power crisis. Speaking on Friday during a stakeholder meeting at Amber House, Nankabirwa said the commencement of [] The post Nankabirwa flags off 400 MW Kiba power dam technical studies as industrial demand hits record high appeared first on Watchdog Uganda.

Watchdog Uganda
Watchdog Uganda

Coverage and analysis from Uganda. All insights are generated by our AI narrative analysis engine.

Uganda
Bias: center

Explore More