Main Roads defers 11-tonne bridge limit decision across South West for three months
0
World

Main Roads defers 11-tonne bridge limit decision across South West for three months

May 12, 2026
Scroll

Posted 1 hour ago by

South West farmers and transport operators have been granted a temporary reprieve, with Main Roads WA delaying 11-tonne bridge load limits for three months.

Main Roads defers 11-tonne bridge limit decision across South West for three months
The West Australian
The West Australian

Coverage and analysis from Australia. All insights are generated by our AI narrative analysis engine.

Australia
Bias: lean right

Explore More